Project Name: Borough of Butler, Site Remediation in Preparation for
Redevelopment
Location of Work: Butler, New Jersey
Work Scope: Excel Environmental Resources,
Inc. (Excel) was retained by the Borough of Butler to perform a Preliminary
Assessment (PA) and subsequent Site Investigation (SI) in order to facilitate
the Borough's intended acquisition and redevelopment of a property as
part of a plan for revitalizing the downtown area of Butler. Funding for
the project in the amount of $100,000.00 was obtained by Excel on behalf
of the Borough of Butler, from the Hazardous Discharge Site Remediation
Fund (HDSRF). Following are some key aspects of the project:
-
As a result of the PA, Excel identified several areas of potential environmental
concern (AOC) that were evaluated during a subsequent SI. In an effort
to satisfy contract-imposed timeframes established on behalf of a prospective
third party developer, Excel accelerated the performance of the SI, with
NJDEP approval prior to completion of the PA to facilitate the proposed
redevelopment project for the site.
-
The SI was performed using a phased approach to streamline investigation
activities and to efficiently utilize the project funds to collect as
much information as possible in an effort to steer the project towards
completion.
-
The first phase of the SI was conducted to verify surface and subsurface
soil quality, including potential Historic Fill, and groundwater quality
at the site.
-
Based on the initial SI activities, a supplemental investigation was conducted
as part of a second phase of SI to evaluate lateral and vertical soil
quality, further evaluate whether constituents reported at concentrations
above the NJDEP soil cleanup criteria during the initial SI were AOC-specific
or associated with contaminated Historic Fill, and to verify groundwater
quality at the site through installation and sampling of monitoring wells.
Project Outcome: As a result of
the phased approach to the SI, characterization of each of the AOCs was
efficiently completed and the data indicate that the majority of soil concentrations
above the applicable NJDEP Soil Cleanup Criteria are associated with contaminated
Historic Fill material. Through Excel's thorough evaluation of each AOC
as part of the SI, the minimum SI and RI requirements for characterization
and delineation of contaminated Historic Fill and the underlying native
soils were satisfied so that no additional investigation was required by
NJDEP. EXCEL ENVIRONMENTAL RESOURCES, INC. With the investigation and delineation
of the Historic Fill complete, no further investigation is warranted and
Excel prepared a Remedial Action Workplan for submission to NJDEP that including
a site-wide Deed Notice as the final remedial action for the Historic Fill
with engineering controls to be fully integrated into the Borough's redevelopment
plans for the property. Redevelopment of the property for a mixed commercial
and retail center will therefore proceed as originally planned with no changes
to the development plan design. The buildings, paved parking areas, and
landscape areas will serve as the NJDEP-required engineering controls as
part of the Deed Notice as the final remedy for the contaminated Historic
Fill.
Client Contact: James Lampmann, Borough Administrator, Borough
of Butler (973) 838-7200
|